Imminent · next 30 days10





Next 90 days34






















Later in 20264

20276


2028 and beyond1
Public space sector — by market value23
Listed constituents; tile area = market capitalisation, colour = sector. Shows US-listed coverage only. Non-US names appear on the calendar above.

From the threadsmentioned in rationales, not yet curated
…g US SCS authority at this stage. NEW [08-22]: SpaceX's own Aug 2026 EU lobbying position paper (dossier-confirmed 08-20) asks c…
…s by end-2025 (target already slipped — first sat only flew Aug 2026), 1,200 by end-2027 (Asia-Pacific coverage, next tripwire),…
…Globalstar's Q2 10-Q — HIBLEO-4 replacement-sat launch due Aug 2026, and "certain governmental authorizations relating to the C…
…sing conditions remain (HIBLEO-4 replacement-sat launch due Aug 2026; C-3 System governmental authorizations pending), Apple ~$9…
…and set the pleading cycle — comments/petitions to deny due Sep 17, oppositions Sep 28, replies Oct 5 — the first dated venue…
…opening the formal comment/opposition/reply pleading cycle (Sep 17/Sep 28/Oct 5) — see 2 GHz MSS spectrum allocation thread fo…
…01637]: Iridium filed its definitive merger proxy setting a Sept 24 2026 special shareholder vote; consideration terms unchanged ($2…
…cycle — comments/petitions to deny due Sep 17, oppositions Sep 28, replies Oct 5 — the first dated venue for SES/Lynk and oth…
…the formal comment/opposition/reply pleading cycle (Sep 17/Sep 28/Oct 5) — see 2 GHz MSS spectrum allocation thread for the S…
…98), opening the live Section 316 protest window, effective 2026-09-29. TRIPWIRE 2 outstanding: SES's Transition Plan (GN 25-59, s…
…ization (Aug 4/5, Payload) — first 6 of ~258 sats launching Oct 2026; context: Space Force defunded its own Resilient GPS progra…
…s/petitions to deny due Sep 17, oppositions Sep 28, replies Oct 5 — the first dated venue for SES/Lynk and other opponents to…
…rmal comment/opposition/reply pleading cycle (Sep 17/Sep 28/Oct 5) — see 2 GHz MSS spectrum allocation thread for the SES/Lyn…
…due first week of Sept, FCC-targeted bidding completion by Nov 5 2026 — AST's first reported bid to OWN, not lease/partner, US sp…
…g outcome is now known — Judge Lopez pushed confirmation to Nov 12 or Dec 2 2026 after Crown Castle (~$3.5B claim) and America…
…agreed order (Colossus 2 turbine-removal deadline extended Dec 2026->Jul 2027) and Rep. Pallone's Aug 11 House E&C document-pro…
…ults state current cash is insufficient to cover the $1.7bn Dec 2026 GEO bond maturity and it "will have to refinance or raise m…
…is now known — Judge Lopez pushed confirmation to Nov 12 or Dec 2 2026 after Crown Castle (~$3.5B claim) and American Tower (~$2B)…
…iced in]. TRIPWIRE FIRED [08-04]: first-ever public-company Q2 2026 results confirmed the cross-subsidy mechanism at segment gr…
…ses the "materially de-risks" framing above]: Telesat's own Q2 2026 results state current cash is insufficient to cover the $1.…
…non-denial on IRIS² positioning. NEW [retro 07-30]: AT&T's Q2 2026 PRIMARY earnings-transcript names AST as its D2D tech partn…
…g wins also cross-read there. PUSHED [08-11, primary 10-Q]: Q2 2026 revenue $234.1M (+62% YoY), backlog $2.36bn (+27.5% since D…
…lied sovereign intel demand catalyst; $1.2B Series F closed Q2 2026. CORRECTED [08-26, dossier note FOR-RETRO, TerraWatch Space…
…till no named-analyst note adjudicating cause — watch SES's Q3 2026 print or a named-analyst explainer before treating the caus…
…-funded spacecraft (~C$1.63bn/$2.3bn total, milestones from Q3 2026); MDA's separate manufacturing order grows 198->225 (+27 un…
…e $125M cluster. NEXT [08-15, dossier note]: also watch the Q3 2026 print (~Nov) for whether the revenue-miss pattern repeats —…
…NT half — contractor Teltrium drafts the Cost Catalog (due ~2027-01-24), ex-parte-EXEMPT till the draft publishes. FCC-26-47: 2-de…
…MDSS/DoD PTT) Iridium holds. EMSS renewal with USSF due "by March 2027" — dark till close, EDGAR-only. NEW [retro 07-28]: Rocket L…
…/3 gov-IRIS²/2/3 EU-open" shorthand. Non-EU licences expire May 2027; ~Sept consortium call. France+Germany want 2GHz "used as a…
…62M termination fee), newly disclosed outside "End Date" is June 28 2027 (extendable Dec 28 2027 if regulatory approvals are the onl…
…der (Colossus 2 turbine-removal deadline extended Dec 2026->Jul 2027) and Rep. Pallone's Aug 11 House E&C document-production de…
…red licenses, $30-75B analyst-estimated proceeds, statutory Jul 4 2027 completion deadline — procedures comment due 08-24, reply 0…
…er/component wins, flat-sat contracts). Iridium deal: close mid-2027 (mechanics, Aireon fold-in, $3.6B bridge loan in dossier);…
…ly disclosed outside "End Date" is June 28 2027 (extendable Dec 28 2027 if regulatory approvals are the only unmet condition) — fir…
…t already slipped — first sat only flew Aug 2026), 1,200 by end-2027 (Asia-Pacific coverage, next tripwire), 5,000 by end-2030 (…
…ministerial subscription; both unlock conditions (orbit by end-2027, upgrades by end-2028) are unproven. First primary evidence…
…oS review active, no timeline; model India MEO at zero thru H1 2027. NEW [retro 2026-07-18]: IN-SPACe/ISRO/DoT-WPC found Jio's…
…st confirmed foothold; Qianfan ~239 deployed thru Group 15, H1 2027 service CONFIRMED. NEW [08-17]: Guowang Group 24 (9 sats, W…
…already contracted) to complete all 225 Lightspeed sats by end-2028 — first primary evidence the SpaceX rideshare-booking freez…
…y end-2027 (Asia-Pacific coverage, next tripwire), 5,000 by end-2030 (global coverage), some reporting to a ~12,000-sat ceiling…
…th customer migration to IRIS² commercial capacity starting mid-2032. NEW [08-17, Handelsblatt via German-financial-press syndic…