← All threads
EXISTENTIAL

2 GHz MSS spectrum allocation

immediatelast moved 2026-08-25

RENAMED [08-07, was "2 GHz MSS / COM(2026)311 final" — pinned to one EC doc, superseded eventually; current instrument still COM(2026)311]. four-way contest; SES/Lynk weakest (Farrar), only EchoStar's SIRION-1 credible on ITU priority. TIGHTENED [retro 08-01, primary EUR-Lex COM(2026)311 read]: precise 10/10/10 MHz three-pool split (secure-IRIS² / EU-new-entrant / open-commercial capped 10MHz-per-applicant), not the earlier "1/3 gov-IRIS²/2/3 EU-open" shorthand. Non-EU licences expire May 2027; ~Sept consortium call. France+Germany want 2GHz "used as a lever" for IRIS² sovereignty (Élysée text, 07-17) vs SpaceConnect's opposition — mechanics in dossier. Amazon — SpaceConnect's lead member — filed FCC SAT-LOA-20260601-00224 (Jul 24), a 5,105-sat D2D constellation on Globalstar's 1.6/2.4GHz post-close: a fifth funded D2D architecture, none European. NEW [08-08]: EP procedure 2026/0134(COD) (COM(2026)311) — watch for ITRE's formal committee referral and rapporteur naming (shadow rapporteur Boeselager, Volt/Greens-EFA, already met Viasat May 27) as the next primary-source EXISTENTIAL-tripwire lead. NEW [retro 08-01]: a sixth, Skylo's Big-LEO D2D filing (SES-MOD-20260522-01396, same 1610-1618.725/ 2483.5-2500MHz bands, surfaced via X 07-31 but filed 05-22 — stale, not pushable, but real), further feeds SpaceConnect's "D2D supply is abundant" argument. EchoStar's $23bn AT&T spectrum sale (closed Jul 28) retiring DISH DBS's Ch.11-trigger debt — the strongest 2 GHz bidder (SIRION-1) enters the ~Sept consortium call materially recapitalized (see Satellite consolidation wave). NEW [08-07]: FCC's unlicensed D2D NPRM (ET Docket 26-169, ~200MHz, no MSS license needed) is a 7th D2D-supply datapoint strengthening SpaceConnect's abundance argument (see Direct-to-device thread). NEW [08-20, PRIMARY, docs.fcc.gov DA 26-866]: FCC formally accepted Amazon/Kuiper's 5,105-sat D2D application (SAT-LOA-20260601-00224) for filing and set the pleading cycle — comments/petitions to deny due Sep 17, oppositions Sep 28, replies Oct 5 — the first dated venue for SES/Lynk and other opponents to formally contest a 7th funded D2D architecture ahead of the ~Sept 2GHz consortium call; Amazon explicitly NOT seeking US SCS authority at this stage. NEW [08-22]: SpaceX's own Aug 2026 EU lobbying position paper (dossier-confirmed 08-20) asks co-legislators to open a full 15MHz block regardless of national origin, lift the Art 20 incumbent-extension moratorium, and route any EU government D2D network to separate spectrum — full detail in dossier, not restated here. RESOLVED [08-25, dossier note FOR-BRIEF]: SpaceX's Aug 7 "MSS supplement" (GN Docket 25-340) is a one-page demisability/casualty-risk addendum with no 2GHz spectrum content, read in full via the filing's own files.fcc.gov/ecfs/download link — not a live tripwire; retired from the manual scan queue. Full detail: dossiers/mss-2ghz-spectrum.md; Amazon side: dossiers/amazon-leo-kuiper.md

EUUSD2D & spectrumSovereign infrastructure demand